Warnings
Traffic Cameras
Interactive Map
Road Conditions
By Region and by Road
Current Warnings
Photo radar devices may be used on specific work sites
Trucking
Hindrances Related to Load and Size
Vertical Bridge Clearances
Load Limits on Bridges
Trucking Network
Rest Areas
Villages-relais
Useful Links
Municipal hindrances
Neighbouring Road Networks
Winter Storm Information
Exclusive Towing in the Metropolitan Area
Road Distances
Québec Official Road Map
Bike Lanes
Off-Highway Vehicles
RSS Feeds
Roadwork - Downloadable GPS Files
Québec 511
>
Road Conditions
>
Current Warnings
Current Warnings
In force since
Louis-H.-La Fontaine Tunnel
Contraflow traffic (north tube), 2 lanes northbound and only one southbound.
Northbound lanes width reduced to 3.2 m. Cause: tunnel repair.
Heavy vehicles:
Coming from A-20 West/A-25 North (towards Montréal), right lane MANDATORY from De Mortagne Blvd.
Coming from A-25 South (towards Longueuil), right lane PROHIBITED from Sherbrooke Street.
February 15, 2024
at 12:29 p.m.
Bas-Saint-Laurent—Gaspésie—Îles-de-la-Madeleine
In force since
Rivière-du-Loup - Saint-Siméon. Ferry service : Closed.
January 16, 2025
at 11:05 a.m.
Additional Information:
Website
Chaudière-Appalaches
In force since
L'Isle-aux-Grues - Montmagny: Air service available. Visit the Société des traversiers du Québec Website. Ferry service : Closed.
January 16, 2025
at 11:25 a.m.
Côte-Nord
In force since
Closure Route Transanticostienne between km 4 and km 264, WESTBOUND and EASTBOUND, L'Île-d'Anticosti, undetermined period. Reason : Reopening planned for May.
December 27, 2024
at 10:56 a.m.
Closure Chemin de la Baie-Sainte-Claire, WESTBOUND and EASTBOUND, L'Île-d'Anticosti, undetermined period. Reason : Reopening planned for May.
December 27, 2024
at 11:56 a.m.
Laurentides—Lanaudière
In force since
Louis-H.-La Fontaine Tunnel
Contraflow traffic (north tube), 2 lanes northbound and only one southbound.
Northbound lanes width reduced to 3.2 m. Cause: tunnel repair.
Heavy vehicles:
Coming from A-20 West/A-25 North (towards Montréal), right lane MANDATORY from De Mortagne Blvd.
Coming from A-25 South (towards Longueuil), right lane PROHIBITED from Sherbrooke Street.
February 15, 2024
at 12:29 p.m.
Laval
In force since
Louis-H.-La Fontaine Tunnel
Contraflow traffic (north tube), 2 lanes northbound and only one southbound.
Northbound lanes width reduced to 3.2 m. Cause: tunnel repair.
Heavy vehicles:
Coming from A-20 West/A-25 North (towards Montréal), right lane MANDATORY from De Mortagne Blvd.
Coming from A-25 South (towards Longueuil), right lane PROHIBITED from Sherbrooke Street.
February 15, 2024
at 12:29 p.m.
Mauricie—Centre-du-Québec
In force since
20
Closure A-20 Sainte-Anne-du-Sault road stop, EASTBOUND, From July 4, 2024 at 6 p.m. to September 30, 2025 at 6 a.m.. Reason : Roadwork.
July 3, 2024
at 4:20 p.m.
Montérégie
In force since
25
Louis-H.-La Fontaine Tunnel
Contraflow traffic (north tube), 2 lanes northbound and only one southbound.
Northbound lanes width reduced to 3.2 m. Cause: tunnel repair.
Heavy vehicles:
Coming from A-20 West/A-25 North (towards Montréal), right lane MANDATORY from De Mortagne Blvd.
Coming from A-25 South (towards Longueuil), right lane PROHIBITED from Sherbrooke Street.
February 15, 2024
at 12:29 p.m.
Montréal
In force since
Louis-H.-La Fontaine Tunnel
Contraflow traffic (north tube), 2 lanes northbound and only one southbound.
Northbound lanes width reduced to 3.2 m. Cause: tunnel repair.
Heavy vehicles:
Coming from A-20 West/A-25 North (towards Montréal), right lane MANDATORY from De Mortagne Blvd.
Coming from A-25 South (towards Longueuil), right lane PROHIBITED from Sherbrooke Street.
February 15, 2024
at 12:29 p.m.
Nord-du-Québec
In force since
Alternating traffic rue Oujé-Bougoumou on the bridge at the height of the Chibougamau River, SOUTHBOUND and NORTHBOUND, Eeyou Istchee Baie-James, undetermined period. Reason : Preventive measures.
December 12, 2024
at 11:36 a.m.
Alternating traffic route du Nord at height rivière Broadback, SOUTHBOUND and NORTHBOUND, Eeyou Istchee Baie-James, undetermined period. Reason : Preventive measures.
December 12, 2024
at 10:57 a.m.
Alternating traffic route du Nord at height rivière Barlow, SOUTHBOUND and NORTHBOUND, Eeyou Istchee Baie-James, undetermined period. Reason : Preventive measures.
December 12, 2024
at 11:41 a.m.
Outaouais
In force since
321
In Saint-André-Avellin, on the bridge of rivière Petite Nation river bridge, track width reduced to 2.5 meters SOUTHBOUND. Undetermined period. Cause: preventive measures.
October 6, 2022
at 1:46 a.m.
Alternating traffic chemin du Barrage Chemin du Barrage, on the bridge over Rivière Blanche. Lane width reduced to 4.6 meters., WESTBOUND and EASTBOUND, Val-des-Monts, undetermined period. Reason : Preventive measures.
December 2, 2022
at 4:09 p.m.
Québec (Capitale-Nationale)
In force since
Rivière-du-Loup - Saint-Siméon. Ferry service : Closed.
January 16, 2025
at 11:05 a.m.
Additional Information:
Website
Saguenay—Lac-Saint-Jean
In force since
172
Bridge over the Rivière aux Vases closed.
1 km detour for all vehicles via Adélard Street at all times. Indefinite period.
October 15, 2024
at 12:14 p.m.