Québec 511 > Road Conditions > By Region and by Road > Autoroute 640

Autoroute 640

Road Conditions
Roadway
Bare (dry or wet)
Partly snow covered, snow packed
or ice covered
Snow covered, snow packed
or ice covered
Visibility
Good
Fair
Poor
Roadwork
Minor hindrance
Major hindrance
Other informations
Warning
Trucks prohibited
Ferry
Border crossing
Current Warnings
Louis-H.-La Fontaine Tunnel
Contraflow traffic (north tube), 2 lanes northbound and only one southbound.
Northbound lanes width reduced to 3.2 m. Cause: tunnel repair.

Heavy vehicles:
Coming from A-20 West/A-25 North (towards Montréal), right lane MANDATORY from De Mortagne Blvd.

Coming from A-25 South (towards Longueuil), right lane PROHIBITED from Sherbrooke Street.
March 6, 2025
at 2:21 p.m.
Thaw
Thaw period From March 24, 2025
to May 23, 2025
Thaw period From March 24, 2025
to May 23, 2025
Thaw period From April 7, 2025
to June 6, 2025
Laurentides—Lanaudière
Roadwork on Laviolette Bridge will resume, mostly on weekend nights, from March 21, 2025 until Fall 2025.

Check the road works in detail for information, among other things, on the planned times of the obstructions.
March 14, 2025
at 4:36 p.m.
Additional Information:
640  

From :  Saint-Joseph-du-Lac

To : Saint-Eustache

Roadway
Bare and Dry
Visibility
Good
640  

From :  Saint-Eustache

To : Bois-des-Filion

Roadway
Bare and Dry
Visibility
Good
640  

From :  Bois-des-Filion

To : Junction of highways 25 and 640 in Terrebonne

Roadway
Bare and Dry
Visibility
Good
640 
À Terrebonne L'entrée du boulevard Marcel-Therrien et Montée des Pionniers pour A-640 est Hindrance
Minor
Direction
West and east
From March 6, 2025 at 5 a.m.
to June 7, 2025 at 9 p.m.
640 
À Terrebonne Sortie 50 (montée des Pionniers, boulevard Marcel-Therrien) Hindrance
Minor
Direction
East
From March 26, 2025 at 9 p.m.
to March 27, 2025 at 5 a.m.
640  

From :  Junction of highways 25 and 640 in Terrebonne

To : Charlemagne

Roadway
Bare and Dry
Visibility
Good