Québec 511 > Trucking > Hindrances Related to Load and Size > Autoroute 55

Autoroute 55

Road Conditions
Roadway
Bare (dry or wet)
Partly snow covered, snow packed
or ice covered
Snow covered, snow packed
or ice covered
Visibility
Good
Fair
Poor
Roadwork
Minor hindrance
Major hindrance
Other informations
Warning
Trucks prohibited
Ferry
Border crossing
Estrie
55  

From :  Stanstead, United States border

To : Sainte-Catherine-de-Hatley

Roadway
Bare and Dry
Visibility
Good
55  

From :  Sainte-Catherine-de-Hatley

To : Magog

Roadway
Bare and Dry
Visibility
Good
55  

From :  Sherbrooke

To : L'Avenir

Roadway
Bare and Dry
Visibility
Good
Mauricie—Centre-du-Québec
Louis-Hippolyte-La Fontaine tunnel

Height clearance reduced to 4.3 meters since May 5, 2025. Recreational vehicles, among others, make sure to respect the height clearance before including the tunnel in your itinerary. .
June 18, 2025
at 11 a.m.
Work on the Laviolette Bridge will resume during weekday nights and sometimes on weekend nights until fall 2025.

Check the roadworks in detail for information, including the planned times of the obstructions.
June 9, 2025
at 11:51 a.m.
Additional Information:
55  

From :  L'Avenir

To : Drummondville, Saint-Nicéphore sector

Roadway
Bare and Dry
Visibility
Good
55  

From :  Drummondville, Saint-Nicéphore sector

To : Junction of highways 20 and 55

Roadway
Bare and Dry
Visibility
Good
55  

From :  Sainte-Eulalie

To : Saint-Célestin

Roadway
Bare and Dry
Visibility
Good
55 
Entre le 9e Rang à Saint-Wenceslas et l'autoroute 20 à Sainte Eulalie. Hindrance
Major
Direction
South and north
From March 31, 2025 at 7 p.m.
to December 19, 2025 at 5:30 a.m.
55  

From :  Saint-Célestin

To : Laviolette Bridge in Bécancour

Roadway
Bare and Dry
Visibility
Good
55  

From :  Laviolette Bridge in Bécancour

To : Junction of highways 40 and 55

Roadway
Bare and Dry
Visibility
Good
55 
À Trois-Rivières et Bécancour, au pont Laviolette situé au-dessus du fleuve Saint-Laurent. Hindrance
Major
Direction
South and north
From March 13, 2025 at 7 p.m.
to December 19, 2025 at 6:30 a.m.
55  

From :  Junction of highways 40 and 55

To : Shawinigan Saint-Georges sector

Roadway
Bare and Dry
Visibility
Good