Québec 511 > Road Conditions > By Region and by Road > Autoroute 50

Autoroute 50

Road Conditions
Roadway
Bare (dry or wet)
Partly snow covered, snow packed
or ice covered
Snow covered, snow packed
or ice covered
Visibility
Good
Fair
Poor
Roadwork
Minor hindrance
Major hindrance
Other informations
Warning
Trucks prohibited
Ferry
Border crossing
Outaouais
50  

From :  Gatineau Hull Sector

To : Gatineau, montée Paiement

Roadway
Bare and Dry
Visibility
Good
50 
À Gatineau, dans la sortie 138 (rue Saint-Louis) de l'autoroute Guy-Lafleur Hindrance
Minor
Direction
East
From October 20, 2025 at 9 a.m.
to October 31, 2025 at 2 p.m.
50  

From :  Gatineau, montée Paiement

To : Gatineau, avenue Lépine

Roadway
Bare and Dry
Visibility
Good
50 
À Gatineau, entre la sortie 159, rue des Laurentides et l'avenue Lépine Hindrance
Major
Direction
West and east
From August 27, 2025 at 6 a.m.
to December 19, 2025 at 8 p.m.
50  

From :  Gatineau, avenue Lépine

To : Plaisance

Roadway
Bare and Dry
Visibility
Good
50  

From :  Plaisance

To : Fassett, montée Boucher

Roadway
Bare and Dry
Visibility
Good
Laurentides—Lanaudière
Closure R-329 between chemin Watchorn and R-364, SOUTHBOUND and NORTHBOUND, Morin-Heights, From October 31, 2025 at 2 p.m. to October 31, 2025 at 9 p.m., detour on local network. Reason : Special events. October 30, 2025
at 10:01 a.m.
Closure R-341 between 4e Avenue and 6e Avenue, SOUTHBOUND and NORTHBOUND, Rawdon, From October 31, 2025 at 2 p.m. to October 31, 2025 at 6 p.m., detour on local network. Reason : Special events. October 30, 2025
at 9:57 a.m.
Sorel-Tracy - Saint-Ignace-de-Loyola: Ferries from Saint-Ignace-de-Loyola depart on the hour and from Sorel-Tracy at half past the hour until mid-November. Cause: 1 ferry in operation. Visit the Société des traversiers du Québec website. Ferry service : Open. October 17, 2025
at 6:07 a.m.
Contraflow traffic rue Baby on the bridge, 1 lane in each direction. Lane width: 3.2 meters, WESTBOUND and EASTBOUND, Joliette, undetermined period. Reason : Inspection. September 23, 2025
at 10:13 a.m.
Louis-Hippolyte-La Fontaine tunnel

Height clearance reduced to 4.3 meters since May 5, 2025. Recreational vehicles, among others, make sure to respect the height clearance before including the tunnel in your itinerary. .
June 18, 2025
at 11 a.m.
50  

From :  Fassett, montée Boucher

To : Lachute

Roadway
Bare and Wet
Visibility
Good
50  

From :  Lachute

To : Junction of highways 15 and 50 in Mirabel

Roadway
Bare and Dry
Visibility
Good
50 
À Mirabel, entre les km 284 et 280 Hindrance
Major
Direction
West and east
From October 15, 2025 at 5 a.m.
to October 31, 2025 at 11:59 p.m.