Warnings
Traffic Cameras
Interactive Map
Road Conditions
By Region and by Road
Current Warnings
Photo radar devices may be used on specific work sites
Trucking
Hindrances Related to Load and Size
Vertical Bridge Clearances
Load Limits on Bridges
Trucking Network
Rest Areas
Villages-relais
Useful Links
Municipal hindrances
Neighbouring Road Networks
Winter Storm Information
Exclusive Towing in the Metropolitan Area
Road Distances
Québec Official Road Map
Bike Lanes
Off-Highway Vehicles
RSS Feeds
Roadwork - Downloadable GPS Files
Québec 511
>
Trucking
>
Hindrances Related to Load and Size
>
Autoroute 40
Autoroute 40
Road Conditions
Roadway
Bare (dry or wet)
Partly snow covered, snow packed
or ice covered
Snow covered, snow packed
or ice covered
Visibility
Good
Fair
Poor
Roadwork
Minor hindrance
Major hindrance
Other informations
Warning
Trucks prohibited
Ferry
Border crossing
Thaw
Thaw period
From March 16, 2026
to May 15, 2026
Thaw period
From April 13, 2026
to May 22, 2026
Thaw period
From April 20, 2026
to May 29, 2026
Montérégie
Sorel-Tracy - Saint-Ignace-de-Loyola: Schedule modified for an indefinite period. Ferries depart from Saint-Ignace-de-Loyola on the hour and from Sorel-Tracy on the half hour. Reason: Only 1 ferry in operation. Consult the Société des traversiers du Québec website. Ferry service : Open.
May 28, 2026
at 6:04 a.m.
Louis-Hippolyte-La Fontaine tunnel
Height clearance reduced to 4.3 meters since May 5, 2025. Recreational vehicles, among others, make sure to respect the height clearance before including the tunnel in your itinerary. .
June 18, 2025
at 11 a.m.
40
Entre Vaudreuil-Dorion et Senneville (île de Montréal), sur le pont de l'Île-aux-Tourtes
Hindrance
Major
Direction
West and east
From September 15, 2025 at 12:01 a.m.
to December 31, 2026 at 5 a.m.
Montréal
Closure A-40 Exit 73 - Aut. 19 ..., WESTBOUND, From May 29, 2026 at 7 p.m. to May 29, 2026 at 11:59 p.m., detour on local network. Reason : Special events.
May 29, 2026
at 5:37 p.m.
Louis-Hippolyte-La Fontaine tunnel
Height clearance reduced to 4.3 meters since May 5, 2025. Recreational vehicles, among others, make sure to respect the height clearance before including the tunnel in your itinerary. .
June 18, 2025
at 11 a.m.
40
Entre Vaudreuil-Dorion et Senneville (île de Montréal), sur le pont de l'Île-aux-Tourtes
Hindrance
Major
Direction
West and east
From September 15, 2025 at 12:01 a.m.
to December 31, 2026 at 5 a.m.
40
Closure A-40 Exit 73 - Aut. 19 ..., WESTBOUND, From May 29, 2026 at 7 p.m. to May 29, 2026 at 11:59 p.m., detour on local network. Reason : Special events.
May 29, 2026
at 5:37 p.m.
Mauricie—Centre-du-Québec
Louis-Hippolyte-La Fontaine tunnel
Height clearance reduced to 4.3 meters since May 5, 2025. Recreational vehicles, among others, make sure to respect the height clearance before including the tunnel in your itinerary. .
June 18, 2025
at 11 a.m.
40
Entre la R-361 à Sainte-Geneviève-de-Batiscan et la R-159 à Sainte-Anne-de-la-Pérade
Hindrance
Major
Direction
West and east
From May 24, 2026 at 10 p.m.
to June 5, 2026 at 12 p.m.
Québec (Capitale-Nationale)
Tadoussac - Baie-Sainte-Catherine: Schedule modified for an undetermined period. Consult the Société des traversiers du Québec website. Ferry service : Open.
May 11, 2026
at 6:30 a.m.
Rivière-du-Loup - Saint-Siméon: For updates on the status of the ferry service, please consult the ferry Website. Ferry service : Open.
April 2, 2026
at 11:53 a.m.
40
À Québec, entre l'A-740 et le boulevard de l'Ormière
Hindrance
Major
Direction
West and east
From May 3, 2026 at 7 p.m.
to July 31, 2026 at 11:59 p.m.