Warnings
Traffic Cameras
Interactive Map
Road Conditions
By Region and by Road
Current Warnings
Photo radar devices may be used on specific work sites
Trucking
Hindrances Related to Load and Size
Vertical Bridge Clearances
Load Limits on Bridges
Trucking Network
Rest Areas
Villages-relais
Useful Links
Municipal hindrances
Neighbouring Road Networks
Winter Storm Information
Exclusive Towing in the Metropolitan Area
Road Distances
Québec Official Road Map
Bike Lanes
Off-Highway Vehicles
RSS Feeds
Roadwork - Downloadable GPS Files
Québec 511
>
Road Conditions
>
By Region and by Road
>
Route 367
Route 367
Road Conditions
Roadway
Bare (dry or wet)
Partly snow covered, snow packed
or ice covered
Snow covered, snow packed
or ice covered
Visibility
Good
Fair
Poor
Roadwork
Minor hindrance
Major hindrance
Other informations
Warning
Trucks prohibited
Ferry
Border crossing
Mauricie—Centre-du-Québec
Louis-Hippolyte-La Fontaine tunnel
Height clearance reduced to 4.3 meters since May 5, 2025. Recreational vehicles, among others, make sure to respect the height clearance before including the tunnel in your itinerary. .
June 18, 2025
at 11 a.m.
Work on the Laviolette Bridge will resume during weekday nights and sometimes on weekend nights until fall 2025.
Check the roadworks in detail for information, including the planned times of the obstructions.
June 9, 2025
at 11:51 a.m.
Additional Information:
Work schedule
(159 Kb)
Press release
(116 Kb)
367
À Notre-Dame-de-Montauban, sur la rue Principale, entre la rue du Couvent et la rue de la Montagne (no civique 744).
Hindrance
Minor
Direction
South and north
From August 4, 2025 at 12:01 a.m.
to September 2, 2025 at 11:59 p.m.
Québec (Capitale-Nationale)
Work on pont Pierre-Laporte SOUTHBOUND, between Québec and Lévis, from September 2 to 16. Closure of 2 lanes out of 3, from Sunday to Wednesday between 9 pm and 5 am the next day and Thursday between 10 pm and 5 am the next day.
August 29, 2025
at 11:09 a.m.
Oversized shipments are being transported from the ports of Quebec City, Pointe-au-Pic in La Malbaie, and Grande-Anse in Saguenay to Saint-Tite-des-Caps as part of a new wind power project. These shipments of huge pieces will continue until the end of November 2025.
The roads used by these transports are: A-40, A-73 Laurentienne, A-73 Henri-IV, A-440 Charest, A-740, R-136, R-138, R-362, R-175, A-70 and local roads.
Be careful and patient!
August 21, 2025
at 1:27 p.m.
367
Entre la rue Turmel à Saint-Raymond et le chemin Thomas-Maher à Sainte-Catherine-de-la-Jacques-Cartier
Hindrance
Minor
Direction
South and north
From September 3, 2025 at 8 a.m.
to September 3, 2025 at 3 p.m.