Route 349

Road Conditions
Roadway
Bare (dry or wet)
Partly snow covered, snow packed
or ice covered
Snow covered, snow packed
or ice covered
Visibility
Good
Fair
Poor
Roadwork
Minor hindrance
Major hindrance
Other informations
Warning
Trucks prohibited
Ferry
Border crossing
Mauricie—Centre-du-Québec
Louis-Hippolyte-La Fontaine tunnel

Height clearance reduced to 4.3 meters since May 5, 2025. Recreational vehicles, among others, make sure to respect the height clearance before including the tunnel in your itinerary. .
June 18, 2025
at 11 a.m.
Work on the Laviolette Bridge will resume during weekday nights and sometimes on weekend nights until fall 2025.

Check the roadworks in detail for information, including the planned times of the obstructions.
June 9, 2025
at 11:51 a.m.
Additional Information:
349  

From :  Louiseville

To : Saint-Paulin

Roadway
Bare and Dry
Visibility
Good
349 
À Saint-Paulin, sur le rang Beauvallon, au pont Baribeau situé au-dessus de la rivière du Loup. Hindrance
Minor
Direction
South and north
From October 7, 2025 at 7 a.m.
to October 23, 2025 at 5 p.m.