Québec 511 > Road Conditions > By Region and by Road > Route 335

Route 335

Road Conditions
Roadway
Bare (dry or wet)
Partly snow covered, snow packed
or ice covered
Snow covered, snow packed
or ice covered
Visibility
Good
Fair
Poor
Roadwork
Minor hindrance
Major hindrance
Other informations
Warning
Trucks prohibited
Ferry
Border crossing
Laurentides—Lanaudière
Closure R-329 between chemin Watchorn and R-364, SOUTHBOUND and NORTHBOUND, Morin-Heights, From October 31, 2025 at 2 p.m. to October 31, 2025 at 9 p.m., detour on local network. Reason : Special events. October 30, 2025
at 10:01 a.m.
Closure R-341 between 4e Avenue and 6e Avenue, SOUTHBOUND and NORTHBOUND, Rawdon, From October 31, 2025 at 2 p.m. to October 31, 2025 at 6 p.m., detour on local network. Reason : Special events. October 30, 2025
at 9:57 a.m.
Sorel-Tracy - Saint-Ignace-de-Loyola: Ferries from Saint-Ignace-de-Loyola depart on the hour and from Sorel-Tracy at half past the hour until mid-November. Cause: 1 ferry in operation. Visit the Société des traversiers du Québec website. Ferry service : Open. October 17, 2025
at 6:07 a.m.
Contraflow traffic rue Baby on the bridge, 1 lane in each direction. Lane width: 3.2 meters, WESTBOUND and EASTBOUND, Joliette, undetermined period. Reason : Inspection. September 23, 2025
at 10:13 a.m.
Louis-Hippolyte-La Fontaine tunnel

Height clearance reduced to 4.3 meters since May 5, 2025. Recreational vehicles, among others, make sure to respect the height clearance before including the tunnel in your itinerary. .
June 18, 2025
at 11 a.m.
335  

From :  Junction of highway 19 and route 335 in Laval

To : Bois-des-Filion

Roadway
Bare and Dry
Visibility
Good
335 
À Saint-Calixte, entre les rues Beauchamps et Duvalière Est Hindrance
Major
Direction
South and north
From July 11, 2025 at 7 a.m.
to October 31, 2025 at 11:59 p.m.
Laval
Louis-Hippolyte-La Fontaine tunnel

Height clearance reduced to 4.3 meters since May 5, 2025. Recreational vehicles, among others, make sure to respect the height clearance before including the tunnel in your itinerary. .
June 18, 2025
at 11 a.m.
335  

From :  Junction of highway 19 and route 335 in Laval

To : Bois-des-Filion

Roadway
Bare and Dry
Visibility
Good