Québec 511 > Road Conditions > By Region and by Road > Route 329

Route 329

Road Conditions
Roadway
Bare (dry or wet)
Partly snow covered, snow packed
or ice covered
Snow covered, snow packed
or ice covered
Visibility
Good
Fair
Poor
Roadwork
Minor hindrance
Major hindrance
Other informations
Warning
Trucks prohibited
Ferry
Border crossing
Laurentides—Lanaudière
Contraflow traffic rue Baby on the bridge, 1 lane in each direction. Lane width: 3.2 meters, WESTBOUND and EASTBOUND, Joliette, undetermined period. Reason : Inspection. September 23, 2025
at 10:13 a.m.
Louis-Hippolyte-La Fontaine tunnel

Height clearance reduced to 4.3 meters since May 5, 2025. Recreational vehicles, among others, make sure to respect the height clearance before including the tunnel in your itinerary. .
June 18, 2025
at 11 a.m.
329 
À Gore, au nord du chemin McDonald Hindrance
Minor
Direction
South and north
From December 17, 2025 at 7 a.m.
to December 19, 2025 at 5 p.m.
329  

From :  Sainte-Agathe-des-Monts

To : Saint-Donat

Roadway
Partly Snow Covered
Visibility
Good