Québec 511 > Road Conditions > By Region and by Road > Route 327

Route 327

Road Conditions
Roadway
Bare (dry or wet)
Partly snow covered, snow packed
or ice covered
Snow covered, snow packed
or ice covered
Visibility
Good
Fair
Poor
Roadwork
Minor hindrance
Major hindrance
Other informations
Warning
Trucks prohibited
Ferry
Border crossing
Laurentides—Lanaudière
Sorel-Tracy - Saint-Ignace-de-Loyola: Ferries from Saint-Ignace-de-Loyola depart on the hour and from Sorel-Tracy at half past the hour until mid-November. Cause: 1 ferry in operation. Visit the Société des traversiers du Québec website. Ferry service : Open. October 17, 2025
at 6:07 a.m.
Contraflow traffic rue Baby on the bridge, 1 lane in each direction. Lane width: 3.2 meters, WESTBOUND and EASTBOUND, Joliette, undetermined period. Reason : Inspection. September 23, 2025
at 10:13 a.m.
Louis-Hippolyte-La Fontaine tunnel

Height clearance reduced to 4.3 meters since May 5, 2025. Recreational vehicles, among others, make sure to respect the height clearance before including the tunnel in your itinerary. .
June 18, 2025
at 11 a.m.
327  

From :  Junction of highway 50 and route 327

To : Junction of routes 148, 327 and rue Principale

Roadway
Bare and Dry
Visibility
Good
327  

From :  Junction of routes 148 and 327 à Lachute

To : Brownsburg-Chatham

Roadway
Bare and Dry
Visibility
Good
327  

From :  Brownsburg-Chatham

To : Montcalm, Weir sector

Roadway
Bare and Dry
Visibility
Good
327  

From :  Montcalm, Weir sector

To : Mont-Tremblant

Roadway
Bare and Dry
Visibility
Good
327 
À Mont-Tremblant, entre la bretelle d'accès à R-117 et la rue Aubin Hindrance
Major
Direction
South and north
From September 15, 2025 at 7 a.m.
to November 21, 2025 at 11:59 p.m.