Québec 511 > Road Conditions > By Region and by Road > Route 327

Route 327

Road Conditions
Roadway
Bare (dry or wet)
Partly snow covered, snow packed
or ice covered
Snow covered, snow packed
or ice covered
Visibility
Good
Fair
Poor
Roadwork
Minor hindrance
Major hindrance
Other informations
Warning
Trucks prohibited
Ferry
Border crossing
Current Warnings
Louis-H.-La Fontaine Tunnel
Contraflow traffic (north tube), 2 lanes northbound and only one southbound.
Northbound lanes width reduced to 3.2 m. Cause: tunnel repair.

Heavy vehicles:
Coming from A-20 West/A-25 North (towards Montréal), right lane MANDATORY from De Mortagne Blvd.

Coming from A-25 South (towards Longueuil), right lane PROHIBITED from Sherbrooke Street.
March 6, 2025
at 2:21 p.m.
Thaw
Thaw period From March 24, 2025
to May 2, 2025
Thaw period From March 24, 2025
to May 16, 2025
Thaw period From April 14, 2025
to May 23, 2025
Laurentides—Lanaudière
Work on the Laviolette Bridge will resume during weekday nights and sometimes on weekend nights until fall 2025.

Check the roadworks in detail for information, including the planned times of the obstructions.
March 28, 2025
at 11:06 a.m.
Additional Information:
327  

From :  Junction of highway 50 and route 327

To : Junction of routes 148, 327 and rue Principale

Roadway
Bare and Wet
Visibility
Good
327  

From :  Junction of routes 148 and 327 à Lachute

To : Brownsburg-Chatham

Roadway
Bare and Wet
Visibility
Good
327  

From :  Brownsburg-Chatham

To : Montcalm, Weir sector

Roadway
Bare and Wet
Visibility
Good
327 
À Montcalm, route du Lac Rond Sud, entre montée de Montcalm et chemin du Lac Beaven Hindrance
Minor
Direction
South and north
From April 30, 2025 at 7 a.m.
to May 1, 2025 at 5 p.m.
327  

From :  Montcalm, Weir sector

To : Mont-Tremblant

Roadway
Bare and Wet
Visibility
Good