Warnings
Traffic Cameras
Interactive Map
Road Conditions
By Region and by Road
Current Warnings
Photo radar devices may be used on specific work sites
Trucking
Hindrances Related to Load and Size
Vertical Bridge Clearances
Load Limits on Bridges
Trucking Network
Rest Areas
Villages-relais
Useful Links
Municipal hindrances
Neighbouring Road Networks
Winter Storm Information
Exclusive Towing in the Metropolitan Area
Road Distances
Québec Official Road Map
Bike Lanes
Off-Highway Vehicles
RSS Feeds
Roadwork - Downloadable GPS Files
Québec 511
>
Trucking
>
Hindrances Related to Load and Size
>
Route 299
Route 299
Road Conditions
Roadway
Bare (dry or wet)
Partly snow covered, snow packed
or ice covered
Snow covered, snow packed
or ice covered
Visibility
Good
Fair
Poor
Roadwork
Minor hindrance
Major hindrance
Other informations
Warning
Trucks prohibited
Ferry
Border crossing
Thaw
Thaw period
From March 16, 2026
to May 15, 2026
Thaw period
From April 13, 2026
to May 22, 2026
Thaw period
From April 20, 2026
to May 29, 2026
Bas-Saint-Laurent—Gaspésie—Îles-de-la-Madeleine
Pohénégamook – Picard – Saint-Antonin wind farm project and the Wolastokuk territory in the Lower St. Lawrence.
From May 25th until December 2026:
Transports of enormous parts will circulate day and night, between the storage area in Saint-Antonin and the wind farm site on the Rivière-Verte road, the Station and Roches roads and the Champoux road.
Transportation will also be available during the day between Matane and Saint-Antonin on the R-132, the A-20, the R-191, the R-291, the A-85, 6th Range, Route des Roches and Chemin Champoux.
Be careful!
May 22, 2026
at 11:08 a.m.
Mesgi'g Ugju's'n 2 wind project in Gaspésie, north of L'Alverne and Escuminac
Starting May 27, oversized transport vehicles will be operating in the Gaspé Peninsula until the fall of 2026.
These transports of enormous parts will circulate day and night, on the Inter-Provincial Boulevard between the JC Van Horne bridge and the R-132 in Pointe-à-la-Croix, then on the R-132 towards the access to the Sainte-Florence wind farm site.
Be careful!
May 22, 2026
at 11:07 a.m.
Rivière-du-Loup - Saint-Siméon: For updates on the status of the ferry service, please consult the ferry Website. Ferry service : Open.
April 2, 2026
at 11:53 a.m.
299
Alternating traffic R-299 at height km 20, SOUTHBOUND and NORTHBOUND, Secteur Rivière-Bonaventure, undetermined period. Reason : Erosion.
May 13, 2026
at 8:28 p.m.
299
Alternating traffic R-299 at height petit ruisseau Morency, SOUTHBOUND and NORTHBOUND, Secteur Rivière-Bonaventure, undetermined period. Reason : Erosion.
May 13, 2026
at 8:22 p.m.