Québec 511 > Road Conditions > By Region and by Road > Route 255

Route 255

Road Conditions
Roadway
Bare (dry or wet)
Partly snow covered, snow packed
or ice covered
Snow covered, snow packed
or ice covered
Visibility
Good
Fair
Poor
Roadwork
Minor hindrance
Major hindrance
Other informations
Warning
Trucks prohibited
Ferry
Border crossing
Mauricie—Centre-du-Québec
Louis-Hippolyte-La Fontaine tunnel

Height clearance reduced to 4.3 meters since May 5, 2025. Recreational vehicles, among others, make sure to respect the height clearance before including the tunnel in your itinerary. .
June 18, 2025
at 11 a.m.
255 
À Saint-Zéphirin-de-Courval, sur le rang Saint-Pierre, entre la route Lassonde et le rang Pioui. Hindrance
Minor
Direction
South and north
From December 15, 2025 at 12:01 a.m.
to December 15, 2025 at 11:59 p.m.