Warnings
Traffic Cameras
Interactive Map
Road Conditions
By Region and by Road
Current Warnings
Photo radar devices may be used on specific work sites
Trucking
Hindrances Related to Load and Size
Vertical Bridge Clearances
Load Limits on Bridges
Trucking Network
Rest Areas
Villages-relais
Useful Links
Municipal hindrances
Neighbouring Road Networks
Winter Storm Information
Exclusive Towing in the Metropolitan Area
Road Distances
Québec Official Road Map
Bike Lanes
Off-Highway Vehicles
RSS Feeds
Roadwork - Downloadable GPS Files
Québec 511
>
Road Conditions
>
By Region and by Road
>
Autoroute 25
Autoroute 25
Road Conditions
Roadway
Bare (dry or wet)
Partly snow covered, snow packed
or ice covered
Snow covered, snow packed
or ice covered
Visibility
Good
Fair
Poor
Roadwork
Minor hindrance
Major hindrance
Other informations
Warning
Trucks prohibited
Ferry
Border crossing
Laurentides—Lanaudière
Louis-Hippolyte-La Fontaine tunnel
Height clearance reduced to 4.3 meters since May 5, 2025. Recreational vehicles, among others, make sure to respect the height clearance before including the tunnel in your itinerary. .
June 18, 2025
at 11 a.m.
25
À Mascouche, entre sortie 34 (chemin Saint-Henri) et l'accès du chemin Sainte-Marie
Hindrance
Major
Direction
South
From July 3, 2025 at 9:30 p.m.
to July 4, 2025 at 5 a.m.
Montérégie
Tuesday to Friday, from July 1st to 4, traffic will be disrupted on certain roads in Quebec as the Tour Charles-Bruneau cyclists pass through the regions of Mauricie, Capitale-Nationale, Chaudière-Appalaches, Centre-du-Québec, Estrie, Montérégie and Montreal.
July 2, 2025
at 3:20 p.m.
Louis-Hippolyte-La Fontaine tunnel
Height clearance reduced to 4.3 meters since May 5, 2025. Recreational vehicles, among others, make sure to respect the height clearance before including the tunnel in your itinerary. .
June 18, 2025
at 11 a.m.
25
Louis-Hippolyte-La Fontaine tunnel
Height clearance reduced to 4.3 meters since May 5, 2025. Recreational vehicles, among others, make sure to respect the height clearance before including the tunnel in your itinerary. .
June 18, 2025
at 11 a.m.
25
À Longueuil et Montréal Entre la sortie 90 (R-132, Varennes, La Prairie) de l'A-20 OUEST et l'accès de la rue Hochelaga, incluant le tunnel Louis-Hippolyte-La Fontaine
Hindrance
Major
Direction
North
From July 4, 2025 at 10:30 p.m.
to July 5, 2025 at 8 a.m.
25
À Montréal (arr. Mercier-Hochelaga-Maisonneuve) L'entrée en provenance de la rue Tellier et des Futailles pour A-25 sud
Hindrance
Minor
Direction
South and north
From February 25, 2022 at 12 a.m.
to December 31, 2025 at 12 a.m.
25
Entre Longueuil et Montréal, le tunnel Louis-Hippolyte-La Fontaine
Hindrance
Major
Direction
South and north
From May 5, 2025 at 5 a.m.
to December 31, 2026 at 12 a.m.
Montréal
Tuesday to Friday, from July 1st to 4, traffic will be disrupted on certain roads in Quebec as the Tour Charles-Bruneau cyclists pass through the regions of Mauricie, Capitale-Nationale, Chaudière-Appalaches, Centre-du-Québec, Estrie, Montérégie and Montreal.
July 2, 2025
at 3:20 p.m.
Louis-Hippolyte-La Fontaine tunnel
Height clearance reduced to 4.3 meters since May 5, 2025. Recreational vehicles, among others, make sure to respect the height clearance before including the tunnel in your itinerary. .
June 18, 2025
at 11 a.m.
25
À Montréal (Mercier-Hochelaga-Maisonneuve) La sortie 4 (avenue Souligny, centre-ville)
Hindrance
Minor
Direction
South and north
From October 31, 2022 at 12 a.m.
to December 31, 2025 at 12 a.m.
25
À Montréal et à Longueuil, entre la sortie 5 (rue Sherbrooke) et l'accès de l'Île-Charron, incluant le tunnel Louis-Hippolyte-La Fontaine
Hindrance
Major
Direction
South
From July 4, 2025 at 11 p.m.
to July 5, 2025 at 5 a.m.
25
À Montréal (Anjou) Entre la sortie 6 (rue Beaubien) et le tunnel Louis-Hippolyte-La Fontaine
Hindrance
Major
Direction
South and north
From November 18, 2022 at 12 a.m.
to December 31, 2025 at 12 a.m.