Québec 511 > Road Conditions > By Region and by Road > Route 209

Route 209

Road Conditions
Roadway
Bare (dry or wet)
Partly snow covered, snow packed
or ice covered
Snow covered, snow packed
or ice covered
Visibility
Good
Fair
Poor
Roadwork
Minor hindrance
Major hindrance
Other informations
Warning
Trucks prohibited
Ferry
Border crossing
Montérégie
Louis-Hippolyte-La Fontaine tunnel

Height clearance reduced to 4.3 meters since May 5, 2025. Recreational vehicles, among others, make sure to respect the height clearance before including the tunnel in your itinerary. .
June 18, 2025
at 11 a.m.
209 
À Saint-Rémi Sur le rang Notre-Dame à la hauteur de la rue Saint-Rémi Hindrance
Minor
Direction
South and north
From September 16, 2025 at 8 a.m.
to September 18, 2025 at 4 p.m.