Québec 511 > Road Conditions > By Region and by Road > Route 201

Route 201

Road Conditions
Roadway
Bare (dry or wet)
Partly snow covered, snow packed
or ice covered
Snow covered, snow packed
or ice covered
Visibility
Good
Fair
Poor
Roadwork
Minor hindrance
Major hindrance
Other informations
Warning
Trucks prohibited
Ferry
Border crossing
Montérégie
Sorel-Tracy - Saint-Ignace-de-Loyola: July 7 and July 8: departures from Sorel-Tracy each hour and departures from Saint-Ignace-de-Loyola at the half hour. Reason: 1 ferry in operation. Visit the Société des traversiers du Québec website. Ferry service : Open. July 4, 2025
at 10:44 a.m.
Louis-Hippolyte-La Fontaine tunnel

Height clearance reduced to 4.3 meters since May 5, 2025. Recreational vehicles, among others, make sure to respect the height clearance before including the tunnel in your itinerary. .
June 18, 2025
at 11 a.m.
201 
À Franklin Entre chemin Lower Concession et Rang du Cinq Hindrance
Minor
Direction
In one direction at a time
From July 1, 2025 at 8 a.m.
to July 11, 2025 at 4 p.m.
201 
À Ormstown Au Nord du chemin Upper Concession Hindrance
Minor
Direction
South and north
From July 1, 2025 at 8 a.m.
to July 11, 2025 at 4 p.m.
201 
À Saint-Stanislas-de-Kostka Entre le rang du Moulin et le rang du Cing Hindrance
Minor
Direction
South and north
From July 1, 2025 at 8 a.m.
to July 11, 2025 at 4 p.m.