Warnings
Traffic Cameras
Interactive Map
Road Conditions
By Region and by Road
Current Warnings
Photo radar devices may be used on specific work sites
Trucking
Hindrances Related to Load and Size
Vertical Bridge Clearances
Load Limits on Bridges
Trucking Network
Rest Areas
Villages-relais
Useful Links
Municipal hindrances
Neighbouring Road Networks
Winter Storm Information
Exclusive Towing in the Metropolitan Area
Road Distances
Québec Official Road Map
Bike Lanes
Off-Highway Vehicles
RSS Feeds
Roadwork - Downloadable GPS Files
Québec 511
>
Road Conditions
>
By Region and by Road
>
Route 195
Route 195
Road Conditions
Roadway
Bare (dry or wet)
Partly snow covered, snow packed
or ice covered
Snow covered, snow packed
or ice covered
Visibility
Good
Fair
Poor
Roadwork
Minor hindrance
Major hindrance
Other informations
Warning
Trucks prohibited
Ferry
Border crossing
Thaw
Thaw period
From March 24, 2025
to May 23, 2025
Thaw period
From March 24, 2025
to May 23, 2025
Thaw period
From March 31, 2025
to May 30, 2025
Bas-Saint-Laurent—Gaspésie—Îles-de-la-Madeleine
Matane - Baie-Comeau: The Saturday, March 15, crossing, scheduled for 8 am between Matane and Godbout, will be redirected to Baie-Comeau. The return trip between Baie-Comeau and Matane will be at 11 am. Reason: harsh weather conditions. Ferry service : Open.
March 14, 2025
at 5 p.m.
Matane - Godbout: The Saturday, March 15, crossing, scheduled for 8 am between Matane and Godbout, will be redirected to Baie-Comeau. The return trip between Baie-Comeau and Matane will be at 11 am. Reason: harsh weather conditions. Ferry service : Open.
March 14, 2025
at 4:59 p.m.
Rivière-du-Loup - Saint-Siméon. Ferry service : Closed.
January 16, 2025
at 11:05 a.m.
Additional Information:
Website
195
From :
Amqui
To :
Matane
Roadway
Bare and Dry
Visibility
Good