Québec 5-1-1


Route 175

Road Conditions
Roadway
Bare (dry or wet)
Partly snow covered, snow packed
or ice covered
Snow covered, snow packed
or ice covered
Visibility
Good
Fair
Poor
Roadwork
Minor hindrance
Major hindrance
Other informations
Warning
Trucks prohibited
Ferry
Border crossing
Current Warnings
Louis-Hippolyte-La Fontaine tunnel roadwork:

Contraflow traffic, 2 lanes towards Montreal and 1 lane towards the south shore. For details, consult the roadwork sites and geolocated warning distributed on interactive map.
November 4, 2022
at 11:36 a.m.
Additional Information:
Tunnel Louis-Hippolyte-La Fontaine
Tunnel arrival time
Québec (Capitale-Nationale)
Tadoussac - Baie-Sainte-Catherine: Departures every 40 minutes on Tuesday, December 6 between 7:40 am and 8 pm. Ferry service : Open. December 2, 2022
at 11:38 a.m.
Québec - Lévis: Some departures reserved only for pedestrians and people with reduced mobility for an undetermined period. From December 5, departures every 40 minutes between 6 am and 8 am and between 4 pm and 6 pm. Visit the Société des traversiers du Québec Website. Ferry service : Open. December 1, 2022
at 2:35 p.m.
L'Isle-aux-Coudres - Saint-Joseph-de-la-Rive: Vehicles longer than 45 feet prohibited for an undetermined period. Ferry service : Open. November 29, 2022
at 10:52 a.m.
175  

From :  Stoneham-et-Tewkesbury

To : Stoneham-et-Tewkesbury at kilometer 73

Roadway
Partly Snow Covered
Visibility
Fair
175  

From :  Stoneham-et-Tewkesbury at kilometer 73

To : L'Étape

Roadway
Snow Covered
Visibility
Good
175  

From :  L'Étape

To : Junction of highway 70 and route 175 in Saguenay

Roadway
Snow Covered
Visibility
Good
Saguenay-Lac-Saint-Jean
Closure R-172 at the height of the Outardes River. Lane width reduced to 3.6 meters. Detour: sharp turn rue de la Bernache., WESTBOUND and EASTBOUND, undetermined period. Reason : Preventive measures. October 6, 2022
at 1:44 a.m.
175  

From :  L'Étape

To : Junction of highway 70 and route 175 in Saguenay

Roadway
Snow Covered
Visibility
Good