Traffic Cameras
Interactive Map
Road Conditions
By Region and by Road
Current Warnings
Photo radar devices may be used on specific work sites
Trucking
Hindrances Related to Load and Size
Vertical Bridge Clearances
Load Limits on Bridges
Trucking Network
Rest Areas
Villages-relais
Useful Links
Neighbouring Road Networks
Winter Storm Information
Exclusive Towing in the Metropolitan Area
Road Distances
Québec Official Road Map
Bicycle-Friendly Roads
Off-Highway Vehicles
RSS Feeds
Roadwork - Downloadable GPS Files
Québec 511
>
Road Conditions
>
By Region and by Road
>
Route 173
Route 173
Road Conditions
Roadway
Bare (dry or wet)
Partly snow covered, snow packed
or ice covered
Snow covered, snow packed
or ice covered
Visibility
Good
Fair
Poor
Roadwork
Minor hindrance
Major hindrance
Other informations
Warning
Trucks prohibited
Ferry
Border crossing
Current Warnings
Louis-Hippolyte-La Fontaine tunnel roadwork:
Contraflow traffic, 2 lanes towards Montreal and 1 lane towards the south shore. For details, consult the roadwork sites and geolocated warning distributed on interactive map.
December 22, 2022
at 9:40 a.m.
Additional Information:
Tunnel Louis-Hippolyte-La Fontaine
Tunnel arrival time
Closure R-138 Sheldrake River Bridge, WESTBOUND and EASTBOUND, Rivière-au-Tonnerre, undetermined period. Reason : Preventive measures.
May 30, 2023
at 3:39 p.m.
Chaudière-Appalaches
Alternating traffic R-269 between rue Martin and route du Domaine, SOUTHBOUND and NORTHBOUND, Adstock, From June 3, 2023 at 7 a.m. to June 3, 2023 at 12 p.m.. Reason : Special events.
May 31, 2023
at 10:31 a.m.
Alternating traffic R-269 between rue Sheink and R-267, SOUTHBOUND and NORTHBOUND, Adstock, From June 3, 2023 at 7 a.m. to June 3, 2023 at 12 p.m.. Reason : Special events.
May 31, 2023
at 10:28 a.m.
Closure R-269 between rue Principale Est and rue Martin, SOUTHBOUND and NORTHBOUND, Adstock, From June 3, 2023 at 7 a.m. to June 3, 2023 at 12 p.m., detour Rue Martin. Reason : Special events.
May 31, 2023
at 10:26 a.m.
Major work on the Laviolette bridge until June 2023.
To find out about the various hindrances associated with these roadwork, consult details on the worksites and the warnings issued.
May 16, 2023
at 12:06 p.m.
Québec - Lévis: Schedule modified for an undetermined period. Visit the Société des traversiers du Québec Website. Ferry service : Open.
May 15, 2023
at 4:35 p.m.
173
Armstrong
(Canada Bound*)
Types of Border Crossers
Wait Time
Update
Travellers
Unavailable
May 31, 2023 at 11:24 p.m.
Commercial flow
Unavailable
May 31, 2023 at 11:24 p.m.
*
Source: Canada Border Services Agency
Jackman
(United States Bound**)
Types of Border Crossers
Wait Time
Update
Travellers
No delay
May 31, 2023 at 11 p.m.
Commercial flow
No delay
May 31, 2023 at 11 p.m.
**
Source: U.S. Customs and Border Protection
173
À Saint-Georges, à la hauteur de la 129e Rue
Hindrance
Minor
Direction
North
From 2023-05-29
to 2023-06-30
173
1 lane closed out of 2 R-173 between R-108 and 115e Rue, SOUTHBOUND and NORTHBOUND, Beauceville, From June 4, 2023 at 8 a.m. to June 4, 2023 at 5 p.m.. Reason : Special events.
May 31, 2023
at 10:07 a.m.
173
À Lévis, à la hauteur de l'A-20
Hindrance
Major
Direction
South and north
From 2023-06-05
to 2023-06-07
173
À Lévis, à la hauteur de l'A-20
Hindrance
Minor
Direction
South and north
From 2023-05-29
to 2023-06-01