Québec 511 > Road Conditions > By Region and by Road > Route 172

Route 172

Road Conditions
Roadway
Bare (dry or wet)
Partly snow covered, snow packed
or ice covered
Snow covered, snow packed
or ice covered
Visibility
Good
Fair
Poor
Roadwork
Minor hindrance
Major hindrance
Other informations
Warning
Trucks prohibited
Ferry
Border crossing
Thaw
Thaw period From March 24, 2025
to May 23, 2025
Thaw period From March 24, 2025
to May 23, 2025
Thaw period From March 31, 2025
to May 30, 2025
Saguenay—Lac-Saint-Jean
Roadwork on Laviolette Bridge will resume, mostly on weekend nights, from March 21, 2025 until Fall 2025.

Check the road works in detail for information, among other things, on the planned times of the obstructions.
March 14, 2025
at 4:36 p.m.
Additional Information:
L'Isle-aux-Coudres - Saint-Joseph-de-la-Rive: No service on Saturday, March 15 between 1 p.m. and 3:45 p.m. Reason: Inspection. Ferry service : Open. March 14, 2025
at 11:20 a.m.
172  

From :  Sacré-Coeur, chemin du Moulin

To : Bardsville

Roadway
Bare and Dry
Visibility
Good
172  

From :  Bardsville

To : Saint-Fulgence, chemin de la Pointe-aux-Pins

Roadway
Bare and Dry
Visibility
Good
172  

From :  Saint-Fulgence, chemin de la Pointe-aux-Pins

To : Junction of routes 172 and 175 in Saguenay

Roadway
Bare and Dry
Visibility
Good
172  

From :  Junction of routes 172 and 175 in Saguenay

To : Saguenay Shipshaw sector

Roadway
Bare and Dry
Visibility
Good
172 
À Saguenay (Chicoutimi), à la hauteur de la rivière aux Vases Hindrance
Major
Direction
West and east
From November 23, 2023 at 12:01 a.m.
to December 19, 2025 at 11:59 p.m.
172  

From :  Saguenay Shipshaw sector

To : Saint-Ambroise

Roadway
Bare and Dry
Visibility
Good
172  

From :  Saint-Ambroise

To : Junction of routes 169 and 172 in Alma

Roadway
Bare and Dry
Visibility
Good
172 
Bridge over the Rivière aux Vases closed.

1 km detour for all vehicles via Adélard Street at all times. Indefinite period.
October 15, 2024
at 12:14 p.m.
Côte-Nord
Matane - Baie-Comeau: The Saturday, March 15, crossing, scheduled for 8 am between Matane and Godbout, will be redirected to Baie-Comeau. The return trip between Baie-Comeau and Matane will be at 11 am. Reason: harsh weather conditions. Ferry service : Open. March 14, 2025
at 5 p.m.
Matane - Godbout: The Saturday, March 15, crossing, scheduled for 8 am between Matane and Godbout, will be redirected to Baie-Comeau. The return trip between Baie-Comeau and Matane will be at 11 am. Reason: harsh weather conditions. Ferry service : Open. March 14, 2025
at 4:59 p.m.
L'Isle-aux-Coudres - Saint-Joseph-de-la-Rive: No service on Saturday, March 15 between 1 p.m. and 3:45 p.m. Reason: Inspection. Ferry service : Open. March 14, 2025
at 11:20 a.m.
172  

From :  Junction of routes 138 and 172

To : Sacré-Coeur, chemin du Moulin

Roadway
Bare and Dry
Visibility
Good
172  

From :  Sacré-Coeur, chemin du Moulin

To : Bardsville

Roadway
Bare and Dry
Visibility
Good