Québec 511 > Road Conditions > By Region and by Road > Route 172

Route 172

Road Conditions
Roadway
Bare (dry or wet)
Partly snow covered, snow packed
or ice covered
Snow covered, snow packed
or ice covered
Visibility
Good
Fair
Poor
Roadwork
Minor hindrance
Major hindrance
Other informations
Warning
Trucks prohibited
Ferry
Border crossing
Thaw
Thaw period From March 16, 2026
to May 15, 2026
Thaw period From March 23, 2026
to May 22, 2026
Thaw period From March 30, 2026
to May 29, 2026
Saguenay—Lac-Saint-Jean
172  

From :  Sacré-Coeur, chemin du Moulin

To : Bardsville

Roadway
Bare and Dry
Visibility
Good
172  

From :  Bardsville

To : Saint-Fulgence, chemin de la Pointe-aux-Pins

Roadway
Bare and Wet
Visibility
Good
172  

From :  Saint-Fulgence, chemin de la Pointe-aux-Pins

To : Junction of routes 172 and 175 in Saguenay

Roadway
Bare and Dry
Visibility
Good
172  

From :  Junction of routes 172 and 175 in Saguenay

To : Saguenay Shipshaw sector

Roadway
Bare and Wet
Visibility
Good
172 
À Saguenay (Chicoutimi), à la hauteur de la rivière aux Vases Hindrance
Major
Direction
West and east
From April 11, 2025 at 12:01 a.m.
to July 10, 2026 at 11:59 p.m.
172  

From :  Saguenay Shipshaw sector

To : Saint-Ambroise

Roadway
Bare and Wet
Visibility
Good
172  

From :  Saint-Ambroise

To : Junction of routes 169 and 172 in Alma

Roadway
Bare and Wet
Visibility
Good
Côte-Nord
ATTENTION: Fuel available (Gasoline) only at Manic V and Fermont for the R-389. February 17, 2026
at 3:04 p.m.
172  

From :  Junction of routes 138 and 172

To : Sacré-Coeur, chemin du Moulin

Roadway
Bare and Dry
Visibility
Good
172  

From :  Sacré-Coeur, chemin du Moulin

To : Bardsville

Roadway
Bare and Dry
Visibility
Good