Route 155

Road Conditions
Roadway
Bare (dry or wet)
Partly snow covered, snow packed
or ice covered
Snow covered, snow packed
or ice covered
Visibility
Good
Fair
Poor
Roadwork
Minor hindrance
Major hindrance
Other informations
Warning
Trucks prohibited
Ferry
Border crossing
Mauricie—Centre-du-Québec
Louis-Hippolyte-La Fontaine tunnel

Height clearance reduced to 4.3 meters since May 5, 2025. Recreational vehicles, among others, make sure to respect the height clearance before including the tunnel in your itinerary. .
June 18, 2025
at 11 a.m.
155  

From :  Shawinigan Saint-Georges sector

To : Rivière-Matawin

Roadway
Bare and Dry
Visibility
Good
155 
À Shawinigan, à la hauteur du pont des Piles. Hindrance
Minor
Direction
South and north
From July 17, 2023 at 12:01 a.m.
to December 20, 2025 at 11:59 p.m.
155  

From :  Rivière-Matawin

To : La Tuque

Roadway
Bare and Dry
Visibility
Good
155  

From :  La Tuque

To : Lac au Pékan

Roadway
Bare and Dry
Visibility
Good
155  

From :  Lac au Pékan

To : Saint-François-de-Sales

Roadway
Bare and Dry
Visibility
Good
Saguenay—Lac-Saint-Jean
155  

From :  Lac au Pékan

To : Saint-François-de-Sales

Roadway
Bare and Dry
Visibility
Good
155  

From :  Saint-François-de-Sales

To : Chambord

Roadway
Bare and Dry
Visibility
Good