Québec 511 > Road Conditions > By Region and by Road > Route 155

Route 155

Road Conditions
Roadway
Bare (dry or wet)
Partly snow covered, snow packed
or ice covered
Snow covered, snow packed
or ice covered
Visibility
Good
Fair
Poor
Roadwork
Minor hindrance
Major hindrance
Other informations
Warning
Trucks prohibited
Ferry
Border crossing
Thaw
Thaw period From March 16, 2026
to May 15, 2026
Thaw period From April 13, 2026
to June 12, 2026
Thaw period From April 20, 2026
to June 19, 2026
Mauricie—Centre-du-Québec
Louis-Hippolyte-La Fontaine tunnel

Height clearance reduced to 4.3 meters since May 5, 2025. Recreational vehicles, among others, make sure to respect the height clearance before including the tunnel in your itinerary. .
June 18, 2025
at 11 a.m.
155  

From :  Shawinigan Saint-Georges sector

To : Rivière-Matawin

Roadway
Bare and Dry
Visibility
Good
155 
À Saint-Roch-de-Mékinac, à proximité du chemin du Versant-Ouest, au kilomètre 29. Hindrance
Minor
Direction
In one direction at a time
From March 16, 2026 at 7 a.m.
to April 15, 2026 at 5 p.m.
155  

From :  Rivière-Matawin

To : La Tuque

Roadway
Bare and Dry
Visibility
Good
155  

From :  La Tuque

To : Lac au Pékan

Roadway
Bare and Dry
Visibility
Good
155  

From :  Lac au Pékan

To : Saint-François-de-Sales

Roadway
Bare and Dry
Visibility
Good
Saguenay—Lac-Saint-Jean
155  

From :  Lac au Pékan

To : Saint-François-de-Sales

Roadway
Bare and Dry
Visibility
Good
155  

From :  Saint-François-de-Sales

To : Chambord

Roadway
Bare and Dry
Visibility
Good