Québec 511 > Road Conditions > By Region and by Road > Route 155

Route 155

Road Conditions
Roadway
Bare (dry or wet)
Partly snow covered, snow packed
or ice covered
Snow covered, snow packed
or ice covered
Visibility
Good
Fair
Poor
Roadwork
Minor hindrance
Major hindrance
Other informations
Warning
Trucks prohibited
Ferry
Border crossing
Mauricie—Centre-du-Québec
Sorel-Tracy - Saint-Ignace-de-Loyola: July 15 and 16: Departures from Saint-Ignace-de-Loyola on the hour and departures from Sorel-Tracy at half past the hour. Reason: 1 ferry in operation. Visit the Société des traversiers du Québec website. Ferry service : Open. July 14, 2025
at 10:06 a.m.
Louis-Hippolyte-La Fontaine tunnel

Height clearance reduced to 4.3 meters since May 5, 2025. Recreational vehicles, among others, make sure to respect the height clearance before including the tunnel in your itinerary. .
June 18, 2025
at 11 a.m.
Work on the Laviolette Bridge will resume during weekday nights and sometimes on weekend nights until fall 2025.

Check the roadworks in detail for information, including the planned times of the obstructions.
June 9, 2025
at 11:51 a.m.
Additional Information:
155 
À La Tuque, entre le pont Gaston-Fortin, situé au-dessus de la rivière Saint-Maurice à Rivière-aux-Rats (kilomètre 84) et le pont du Crique-Clair (kilomètre 94). Hindrance
Major
Direction
South and north
From June 25, 2025 at 7 a.m.
to August 15, 2025 at 6 p.m.
155 
À La Tuque, entre le Km 149 et le Km 173. Hindrance
Minor
Direction
South and north
From July 14, 2025 at 6 a.m.
to July 18, 2025 at 8 p.m.
Saguenay—Lac-Saint-Jean
155 
À Lac-Bouchette, entre le chemin Joseph-Simon et le chemin Malherbe Hindrance
Minor
Direction
South and north
From July 14, 2025 at 6 a.m.
to July 22, 2025 at 6 p.m.
155 
À Saint-François-de-Sales, entre le chemin de la Prairie et le chemin de la Montagne Hindrance
Major
Direction
South and north
From June 16, 2025 at 12 a.m.
to July 18, 2025 at 11:59 p.m.