Québec 511 > Road Conditions > By Region and by Road > Route 153

Route 153

Road Conditions
Roadway
Bare (dry or wet)
Partly snow covered, snow packed
or ice covered
Snow covered, snow packed
or ice covered
Visibility
Good
Fair
Poor
Roadwork
Minor hindrance
Major hindrance
Other informations
Warning
Trucks prohibited
Ferry
Border crossing
Mauricie—Centre-du-Québec
Louis-Hippolyte-La Fontaine tunnel

Height clearance reduced to 4.3 meters since May 5, 2025. Recreational vehicles, among others, make sure to respect the height clearance before including the tunnel in your itinerary. .
June 18, 2025
at 11 a.m.
Work on the Laviolette Bridge will resume during weekday nights and sometimes on weekend nights until fall 2025.

Check the roadworks in detail for information, including the planned times of the obstructions.
June 9, 2025
at 11:51 a.m.
Additional Information:
153 
À Yamachiche, sur le boulevard Duchesne, entre le chemin des Acadiens et le chemin Bournival. Hindrance
Minor
Direction
South and north
From September 15, 2025 at 12:01 a.m.
to October 17, 2025 at 11:59 p.m.
153 
À Saint-Tite, au pont situé au-dessus de la rivière des Envies. Hindrance
Minor
Direction
South and north
From September 18, 2025 at 8:30 a.m.
to September 18, 2025 at 10 a.m.
153 
À Lac-aux-Sables, sur le chemin Saint-Charles, au pont situé au-dessus de la rivière Tawachiche. Hindrance
Minor
Direction
South and north
From September 16, 2025 at 8:30 a.m.
to September 16, 2025 at 10 a.m.
153 
À Lac-aux-Sables, sur le rang Saint-Alphonse, au pont de la Propre situé au-dessus de la rivière Propre. Hindrance
Minor
Direction
South and north
From September 16, 2025 at 10 a.m.
to September 16, 2025 at 12 p.m.