Warnings
Traffic Cameras
Interactive Map
Road Conditions
By Region and by Road
Current Warnings
Photo radar devices may be used on specific work sites
Trucking
Hindrances Related to Load and Size
Vertical Bridge Clearances
Load Limits on Bridges
Trucking Network
Rest Areas
Villages-relais
Useful Links
Municipal hindrances
Neighbouring Road Networks
Winter Storm Information
Exclusive Towing in the Metropolitan Area
Road Distances
Québec Official Road Map
Bike Lanes
Off-Highway Vehicles
RSS Feeds
Roadwork - Downloadable GPS Files
Québec 511
>
Road Conditions
>
By Region and by Road
>
Route 139
Route 139
Road Conditions
Roadway
Bare (dry or wet)
Partly snow covered, snow packed
or ice covered
Snow covered, snow packed
or ice covered
Visibility
Good
Fair
Poor
Roadwork
Minor hindrance
Major hindrance
Other informations
Warning
Trucks prohibited
Ferry
Border crossing
Montérégie
Tuesday to Friday, from July 1st to 4, traffic will be disrupted on certain roads in Quebec as the Tour Charles-Bruneau cyclists pass through the regions of Mauricie, Capitale-Nationale, Chaudière-Appalaches, Centre-du-Québec, Estrie, Montérégie and Montreal.
July 2, 2025
at 3:20 p.m.
Louis-Hippolyte-La Fontaine tunnel
Height clearance reduced to 4.3 meters since May 5, 2025. Recreational vehicles, among others, make sure to respect the height clearance before including the tunnel in your itinerary. .
June 18, 2025
at 11 a.m.
139
À Roxton Falls Rue de l'Église À la hauteur de la rue Marie-Paule
Hindrance
Minor
Direction
South and north
From June 25, 2025 at 6 a.m.
to July 4, 2025 at 6 p.m.