Québec 5-1-1


Route 136

Road Conditions
Roadway
Bare (dry or wet)
Partly snow covered, snow packed
or ice covered
Snow covered, snow packed
or ice covered
Visibility
Good
Fair
Poor
Roadwork
Minor hindrance
Major hindrance
Other informations
Warning
Trucks prohibited
Ferry
Border crossing
Current Warnings
Louis-Hippolyte-La Fontaine tunnel roadwork:

Contraflow traffic, 2 lanes towards Montreal and 1 lane towards the south shore. For details, consult the roadwork sites and geolocated warning distributed on interactive map.
December 22, 2022
at 9:40 a.m.
Additional Information:
Tunnel Louis-Hippolyte-La Fontaine
Tunnel arrival time
Truck traffic prohibited Pont Papineau-Leblanc between Montréal and Laval, SOUTHBOUND and NORTHBOUND, undetermined period. Reason : Preventive measures. October 25, 2022
at 11:10 a.m.
Thaw
Thaw period From March 20, 2023
to May 19, 2023
Thaw period From March 27, 2023
to May 26, 2023
Thaw period From April 10, 2023
to June 9, 2023
Montréal
Louis-Hippolyte-La Fontaine tunnel: Contraflow traffic, 2 lanes available northbound, 1 lane available southbound. Width of each north lane reduced to 3.2 meters. Cause: Roadwork. Heavy vehicles: - Westbound, towards Montreal, from De Mortagne, keep the right lane. - Southbound, towards Longueuil, from Sherbrooke Street, traffic prohibited in the right lane. January 11, 2023
at 1:26 p.m.
Slow-moving traffic A-20 Towards A-10 east, towards Montreal, traffic on diverted lanes, lane width reduced to 3.9 meters., WESTBOUND, undetermined period. Reason : Work planned later. October 6, 2022
at 1:45 a.m.
Slow-moving traffic A-20 towards A-10 west, traffic on diverted lanes and lane width at 3.9 metres., WESTBOUND, undetermined period. Reason : Work planned later. October 6, 2022
at 1:45 a.m.
136  

From :  Turcot Interchange

To : Jacques-Cartier Bridge in Montréal

Roadway
Bare and Dry
Visibility
Good
136 
À Montréal (arr. Ville-Marie) Autoroute Ville-Marie La sortie 6 (rue Berri), avant le tunnel Viger Hindrance
Minor
Direction
East
From 2023-03-20
to 2023-12-20
Québec (Capitale-Nationale)
Québec - Lévis: Modified schedule for an indefinite period. Visit the Société des traversiers du Québec website. Ferry service : Open. March 27, 2023
at 6:07 a.m.
Major work to come on the Laviolette bridge.

Contraflow traffic from Friday at 8 p.m. to Monday at 6:30 a.m. during the weekends of March 31, April 7 and April 14.
March 21, 2023
at 8:45 a.m.
L'Isle-aux-Coudres - Saint-Joseph-de-la-Rive: Vehicles over 45 feet prohibited for an undetermined period. Ferry service : Open. March 13, 2023
at 6:39 a.m.
136  

From :  Pierre-Laporte Bridge in Québec

To : Québec, côte Gilmour

Roadway
Bare and Wet
Visibility
Good
136 
À Québec, entre la côte de Sillery et la côte Gilmour Hindrance
Minor
Direction
West
From 2022-04-21
to 2023-04-15
Québec - Lévis Ferry service:
Open
Additional information
* Source : Société des traversiers