Louis-Hippolyte-La Fontaine tunnel roadwork:

Contraflow traffic, 2 lanes towards Montreal and 1 lane towards the south shore. For details, consult the roadwork sites and geolocated warning distributed on interactive map.
December 22, 2022
at 9:40 a.m.
Additional Information:
Tunnel Louis-Hippolyte-La Fontaine
Tunnel arrival time
Truck traffic prohibited Pont Papineau-Leblanc between Montréal and Laval, SOUTHBOUND and NORTHBOUND, undetermined period. Reason : Preventive measures. October 25, 2022
at 11:10 a.m.
Closure R-138 Sheldrake River Bridge, WESTBOUND and EASTBOUND, Rivière-au-Tonnerre, undetermined period. Reason : Preventive measures. May 30, 2023
at 3:39 p.m.
Laurentides—Lanaudière
Major work on the Laviolette bridge until June 2023.

To find out about the various hindrances associated with these roadwork, consult details on the worksites and the warnings issued.
May 16, 2023
at 12:06 p.m.
125 
À Sainte-Julienne, à l'intersection des routes 125 et 337 Hindrance
Minor
Direction
In both directions
From 2023-05-29
to 2023-06-09
125 
À Saint-Donat, au sud du chemin Langlois Hindrance
Minor
Direction
South and north
From 2023-06-05
to 2023-06-08
125 
À Saint-Donat, entre les chemins Régimbald et Clé-du-Pimbina Hindrance
Minor
Direction
South and north
From 2023-05-29
to 2023-06-01
Montréal
Slow-moving traffic A-20 Towards A-10 east, towards Montreal, traffic on diverted lanes, lane width reduced to 3.9 meters., WESTBOUND, Brossard, undetermined period. Reason : Work planned later. May 9, 2023
at 2:23 p.m.
Slow-moving traffic A-20 towards A-10 west, traffic on diverted lanes and lane width at 3.9 metres., WESTBOUND, Brossard, undetermined period. Reason : Work planned later. May 9, 2023
at 2:22 p.m.
Louis-Hippolyte-La Fontaine tunnel: Contraflow traffic, 2 lanes available northbound, 1 lane available southbound. Width of each north lane reduced to 3.2 meters. Cause: Roadwork. Heavy vehicles: - Westbound, towards Montreal, from De Mortagne, keep the right lane. - Southbound, towards Longueuil, from Sherbrooke Street, traffic prohibited in the right lane. January 11, 2023
at 1:26 p.m.
125 
Entre Montréal (arr. Montréal-Nord) et Laval Sur le boulevard Pie-IX, incluant le pont Pie-IX, enjambant la rivière des Prairies Entre la rue de Charleroi et le boulevard de la Concorde Hindrance
Major
Direction
In both directions
From 2023-05-31
to 2023-06-01
Laval
125 
Entre Montréal (arr. Montréal-Nord) et Laval Sur le boulevard Pie-IX, incluant le pont Pie-IX, enjambant la rivière des Prairies Entre la rue de Charleroi et le boulevard de la Concorde Hindrance
Major
Direction
In both directions
From 2023-05-01
to 2023-06-02
125 
À Laval La bretelle de sortie 12E pour la voie de desserte de l'A-440 est Hindrance
Minor
Direction
North
From 2023-05-31
to 2023-06-01