Route 117

Road Conditions
Roadway
Bare (dry or wet)
Partly snow covered, snow packed
or ice covered
Snow covered, snow packed
or ice covered
Visibility
Good
Fair
Poor
Roadwork
Minor hindrance
Major hindrance
Other informations
Warning
Trucks prohibited
Ferry
Border crossing
Thaw
Thaw period From March 16, 2026
to May 15, 2026
Thaw period From April 13, 2026
to May 22, 2026
Thaw period From April 20, 2026
to May 29, 2026
Abitibi-Témiscamingue
117 
Au Réservoir-Dozois, sur la route 117, entre les kilomètres 392 et 398, Hindrance
Major
Direction
South and north
From June 1, 2026 at 7 a.m.
to August 15, 2026 at 5:30 p.m.
Laurentides—Lanaudière
Sorel-Tracy - Saint-Ignace-de-Loyola: Schedule modified for an indefinite period. Ferries depart from Saint-Ignace-de-Loyola on the hour and from Sorel-Tracy on the half hour. Reason: Only 1 ferry in operation. Consult the Société des traversiers du Québec website. Ferry service : Open. May 28, 2026
at 6:04 a.m.
Alternating traffic R-343 at height rivière L'Assomption, SOUTHBOUND and NORTHBOUND, Saint-Paul, undetermined period. Reason : Inspection. April 14, 2026
at 2:49 p.m.
Contraflow traffic rue Baby on the bridge, 1 lane in each direction. Lane width: 3.2 meters, WESTBOUND and EASTBOUND, Joliette, undetermined period. Reason : Inspection. September 23, 2025
at 10:13 a.m.
Louis-Hippolyte-La Fontaine tunnel

Height clearance reduced to 4.3 meters since May 5, 2025. Recreational vehicles, among others, make sure to respect the height clearance before including the tunnel in your itinerary. .
June 18, 2025
at 11 a.m.
117 
À Sainte-Agathe-des-Monts, entre la rue Godon et la R-329 Hindrance
Major
Direction
South and north
From May 24, 2026 at 10 p.m.
to June 10, 2026 at 11:59 p.m.
117 
À Sainte-Agathe-des-Monts, entre la rue Gordon et la R-329 Hindrance
Major
Direction
South and north
From May 18, 2026 at 9 p.m.
to June 1, 2026 at 5 a.m.