Québec 511 > Road Conditions > By Region and by Road > Route 116

Route 116

Road Conditions
Roadway
Bare (dry or wet)
Partly snow covered, snow packed
or ice covered
Snow covered, snow packed
or ice covered
Visibility
Good
Fair
Poor
Roadwork
Minor hindrance
Major hindrance
Other informations
Warning
Trucks prohibited
Ferry
Border crossing
Current Warnings
Louis-H.-La Fontaine Tunnel
Contraflow traffic (north tube), 2 lanes northbound and only one southbound.
Northbound lanes width reduced to 3.2 m. Cause: tunnel repair.

Heavy vehicles:
Coming from A-20 West/A-25 North (towards Montréal), right lane MANDATORY from De Mortagne Blvd.

Coming from A-25 South (towards Longueuil), right lane PROHIBITED from Sherbrooke Street.
March 6, 2025
at 2:21 p.m.
Thaw
Thaw period From March 24, 2025
to May 2, 2025
Thaw period From March 24, 2025
to May 16, 2025
Thaw period From April 14, 2025
to May 23, 2025
Montérégie
116 
Boulevard Sir-Wilfrid-Laurier Entre le rang des Trente à Saint-Basilele-Grand Et la rue McMaster à McMasterville Hindrance
Minor
Direction
East
From February 4, 2025 at 5 a.m.
to May 30, 2025 at 11:59 p.m.
116  

From :  Junction of highway 20 and route 116 in Saint-Liboire

To : Acton Vale

Roadway
Bare and Dry
Visibility
Good
116 
À Acton Vale Sur la rue d'Acton Entre la route Macdonald et la R-139 Hindrance
Minor
Direction
In one direction at a time
From April 28, 2025 at 9 a.m.
to April 30, 2025 at 3 p.m.
116  

From :  Acton Vale

To : Melbourne

Roadway
Bare and Dry
Visibility
Good
Estrie
116  

From :  Acton Vale

To : Melbourne

Roadway
Bare and Dry
Visibility
Good
116  

From :  Melbourne

To : Kingsey Falls

Roadway
Bare and Dry
Visibility
Good
Mauricie—Centre-du-Québec
Work on the Laviolette Bridge will resume during weekday nights and sometimes on weekend nights until fall 2025.

Check the roadworks in detail for information, including the planned times of the obstructions.
March 28, 2025
at 11:06 a.m.
Additional Information:
116  

From :  Acton Vale

To : Melbourne

Roadway
Bare and Dry
Visibility
Good
116  

From :  Kingsey Falls

To : Junction of routes 116 and 161

Roadway
Bare and Dry
Visibility
Good
116  

From :  Junction of routes 116 and 161

To : Princeville

Roadway
Bare and Dry
Visibility
Good
116 
À Victoriaville, sur le boulevard d'Arthabaska Ouest,au pont d'Arthabaska situé au-dessus de la rivière Nicolet. Hindrance
Minor
Direction
West and east
From April 30, 2025 at 8:30 p.m.
to May 1, 2025 at 6 a.m.
116  

From :  Princeville

To : Plessisville

Roadway
Bare and Dry
Visibility
Good