Québec 511 > Road Conditions > By Region and by Road > Route 116

Route 116

Road Conditions
Roadway
Bare (dry or wet)
Partly snow covered, snow packed
or ice covered
Snow covered, snow packed
or ice covered
Visibility
Good
Fair
Poor
Roadwork
Minor hindrance
Major hindrance
Other informations
Warning
Trucks prohibited
Ferry
Border crossing
Montérégie
Louis-Hippolyte-La Fontaine tunnel

Height clearance reduced to 4.3 meters since May 5, 2025. Recreational vehicles, among others, make sure to respect the height clearance before including the tunnel in your itinerary. .
June 18, 2025
at 11 a.m.
116 
À Acton Vale Entre le boulevard Méthot et la R-139 Hindrance
Minor
Direction
West and east
From July 11, 2025 at 9 a.m.
to July 11, 2025 at 3 p.m.
Mauricie—Centre-du-Québec
Louis-Hippolyte-La Fontaine tunnel

Height clearance reduced to 4.3 meters since May 5, 2025. Recreational vehicles, among others, make sure to respect the height clearance before including the tunnel in your itinerary. .
June 18, 2025
at 11 a.m.
Work on the Laviolette Bridge will resume during weekday nights and sometimes on weekend nights until fall 2025.

Check the roadworks in detail for information, including the planned times of the obstructions.
June 9, 2025
at 11:51 a.m.
Additional Information:
116 
À Durham-Sud, entre les intersections du chemin Deslandes. Hindrance
Major
Direction
West and east
From July 7, 2025 at 6 a.m.
to July 17, 2025 at 6 p.m.