Québec 511 > Road Conditions > By Region and by Road > Route 116

Route 116

Road Conditions
Roadway
Bare (dry or wet)
Partly snow covered, snow packed
or ice covered
Snow covered, snow packed
or ice covered
Visibility
Good
Fair
Poor
Roadwork
Minor hindrance
Major hindrance
Other informations
Warning
Trucks prohibited
Ferry
Border crossing
Thaw
Thaw period From March 16, 2026
to May 15, 2026
Thaw period From April 13, 2026
to June 12, 2026
Thaw period From April 20, 2026
to June 19, 2026
Montérégie
Louis-Hippolyte-La Fontaine tunnel

Height clearance reduced to 4.3 meters since May 5, 2025. Recreational vehicles, among others, make sure to respect the height clearance before including the tunnel in your itinerary. .
June 18, 2025
at 11 a.m.
116  

From :  Junction of highway 20 and route 116 in Saint-Liboire

To : Acton Vale

Roadway
Bare and Wet
Visibility
Good
116  

From :  Acton Vale

To : Melbourne

Roadway
Bare and Wet
Visibility
Good
Estrie
116  

From :  Acton Vale

To : Melbourne

Roadway
Bare and Wet
Visibility
Good
116  

From :  Melbourne

To : Kingsey Falls

Roadway
Bare and Wet
Visibility
Good
Mauricie—Centre-du-Québec
Louis-Hippolyte-La Fontaine tunnel

Height clearance reduced to 4.3 meters since May 5, 2025. Recreational vehicles, among others, make sure to respect the height clearance before including the tunnel in your itinerary. .
June 18, 2025
at 11 a.m.
116  

From :  Acton Vale

To : Melbourne

Roadway
Bare and Wet
Visibility
Good
116  

From :  Kingsey Falls

To : Junction of routes 116 and 161

Roadway
Bare and Wet
Visibility
Good
116  

From :  Junction of routes 116 and 161

To : Princeville

Roadway
Bare and Dry
Visibility
Good
116  

From :  Princeville

To : Plessisville

Roadway
Bare and Dry
Visibility
Good
116 
À Lyster, au pont situé au-dessus de la rivière Bécancour. Hindrance
Minor
Direction
In one direction at a time
From April 28, 2026 at 8:30 p.m.
to April 29, 2026 at 6 a.m.