Québec 511 > Road Conditions > Worksite in Detail
 
349
Hindranceminor (weekday) Start:
End:
Update:
December 1, 2025 at 7 a.m.
December 3, 2025 at 5 p.m.
November 25, 2025 at 10 a.m.

Direction(s): North
Location: À Saint-Alexis-des-Monts, sur le rang de la Rivière-aux-Écorces, au pont situé au-dessus de la rivière aux Écorces.
Work Type: Réparation de structure
Hindrance: Circulation en alternance, du lundi au mercredi, entre 7 h et 17 h.


Top of the page.