Québec 511 > Road Conditions > Worksite in Detail
 
138
Hindranceminor (weekday) Start:
End:
Update:
November 20, 2025 at 9 a.m.
November 20, 2025 at 3 p.m.
November 18, 2025 at 1:42 p.m.

Direction(s): West
Location: À Repentigny et Montréal, sur le pont Jean-Baptiste-Le Gardeur
Work Type: Installation de fibre optique
Hindrance: Fermeture de 1 voie sur 2
Jeudi, de 9 h à 15 h


Top of the page.