|
|
|
138
|
Hindrance: minor (weekday) |
Start:
End:
Update: |
November 20, 2025 at 9 a.m.
November 20, 2025 at 3 p.m.
November 18, 2025 at 1:42 p.m.
|
|
|
Direction(s): |
West |
|
|
Location: |
À Repentigny et Montréal, sur le pont Jean-Baptiste-Le Gardeur |
|
|
Work Type: |
Installation de fibre optique
|
|
|
Hindrance: |
Fermeture de 1 voie sur 2
Jeudi, de 9 h à 15 h |
|
|
|