|
|
|
265
|
Hindrance: minor (weekday) |
Start:
End:
Update: |
November 5, 2025 at 8 a.m.
November 6, 2025 at 4 p.m.
October 24, 2025 at 12:41 p.m.
|
|
|
Direction(s): |
In one direction at a time |
|
|
Location: |
À Notre-Dame-de-Lourdes, au pont situé au-dessus de la rivière Bécancour. |
|
|
Work Type: |
Inspection de structure
|
|
|
Hindrance: |
-Le 5 novembre, entre 8 h et 17 h.
-Le 6 novembre, entre 11 h et 16 h.
Circulation en alternance. |
|
|
|