Québec 511 > Road Conditions > Worksite in Detail
 
267
Hindranceminor (weekday) Start:
End:
Update:
October 23, 2025 at 8 a.m.
October 23, 2025 at 1 p.m.
October 20, 2025 at 6:38 a.m.

Direction(s): South and north
Location: À Adstock, sur le pont de la rivière aux Rats Muskés
Work Type: Inspection de structure
Hindrance: Circulation en alternance, jeudi entre 8 h et 13 h


Top of the page.