Québec 511 > Road Conditions > Worksite in Detail
 
281
Hindranceminor (weekday) Start:
End:
Update:
October 20, 2025 at 1 p.m.
October 20, 2025 at 5 p.m.
October 15, 2025 at 10:10 a.m.

Direction(s): South and north
Location: À Saint-Charles-de-Bellechasse, sur le pont de la rivière Boyer
Work Type: Inspection de structure
Hindrance: Circulation en alternance, lundi entre 13 h et 17 h


Top of the page.