198
Hindranceminor (weekday) Start:
End:
Update:
October 16, 2025 at 6:30 a.m.
October 16, 2025 at 8 p.m.
October 14, 2025 at 6:20 a.m.

Direction(s): West and east
Location: Secteur Mont-Albert, sur le pont de la rivière Madeleine
Work Type: Inspection de structure
Hindrance: Circulation en alternance, jeudi entre 6 h 30 et 20 h
Hindrances Related to Load and Size: Largeur de la voie réduite à 4 mètres


Top of the page.