Québec 511 > Road Conditions > Worksite in Detail
 
243
Hindranceminor (weekday) Start:
End:
Update:
October 8, 2025 at 11 a.m.
October 8, 2025 at 3 p.m.
October 3, 2025 at 3:34 p.m.

Direction(s): South and north
Location: Au Lac Brome
Chemin Lakeside
Pont au-dessus du Ruisseau Cold
Work Type: Inspection de pont
Hindrance: Circulation en alternance
Mercredi, entre 11 h à 15 h


Top of the page.