Québec 511 > Road Conditions > Worksite in Detail
 
173
Hindrancemajor (weekday) Start:
End:
Update:
October 15, 2025 at 8 a.m.
October 30, 2025 at 4 p.m.
October 9, 2025 at 3:08 p.m.

Direction(s): South and north
Location: À Saint-Henri, entre la rue Lacroix et la rue Picard
Work Type: Réfection d'un trottoir
Hindrance: Du lundi au vendredi entre 8 h et 16 h
- Circulation en alternance
Hindrances Related to Load and Size: Largeur de la voie réduite à 3,3 mètres


Top of the page.