Québec 511 > Road Conditions > Worksite in Detail
 
     
Hindranceminor (weekday) Start:
End:
Update:
September 22, 2025 at 1 p.m.
September 22, 2025 at 5 p.m.
September 17, 2025 at 10:08 a.m.

Direction(s): West and east
Location: À Saint-François-du-Lac, sur la rue Notre-Dame, au pont Blondin situé à la Décharge des Gills.
Work Type: Inspection de structure
Hindrance: Circulation en alternance, entre 13 h et 17 h.


Top of the page.