Québec 511 > Road Conditions > Worksite in Detail
 
     
Hindranceminor (weekday) Start:
End:
Update:
September 22, 2025 at 7 a.m.
September 25, 2025 at 5 p.m.
September 15, 2025 at 4:27 p.m.

Direction(s): North
Location: À Saint-Samuel, sur la rue Sainte-Hélène, au pont situé au-dessus de la rivière Bulstrode.
Work Type: Réparation de structure
Hindrance: Circulation en alternance, entre 7 h et 17 h.


Top of the page.