Québec 511 > Road Conditions > Worksite in Detail
 
40
Hindrancemajor (weekday) Start:
End:
Update:
September 17, 2025 at 10 p.m.
September 18, 2025 at 5 a.m.
September 17, 2025 at 10:05 a.m.

Direction(s): East
Location: À Montréal, entre l'échangeur des Laurentides et le boulevard de l'Acadie
Work Type: Peinture
Hindrance: Fermeture de 1 voie sur 2
De mercredi 22 h à jeudi 5 h
Public Transit:


Top of the page.