Québec 511 > Road Conditions > Worksite in Detail
 
159
Hindranceminor (weekday) Start:
End:
Update:
September 18, 2025 at 10 a.m.
September 18, 2025 at 12 p.m.
September 10, 2025 at 3:21 p.m.

Direction(s): South and north
Location: À Saint-Tite, sur le rang du Haut-du-Lac Sud, au pont situé au-dessus de la rivière Mékinac du Sud.
Work Type: Entretien de structure
Hindrance: Circulation en alternance, entre 10 h et midi.


Top of the page.