Québec 511 > Road Conditions > Worksite in Detail
 
     
Hindranceminor (weekday) Start:
End:
Update:
September 16, 2025 at 9:30 a.m.
September 16, 2025 at 3:30 p.m.
September 4, 2025 at 3:51 p.m.

Direction(s): In one direction at a time
Location: À Saint-Alexis-des-Monts, sur le rang du Lac-du-Castor, au-dessus de la Décharge du Lac Carolus.
Work Type: Inspection de structure
Hindrance: Circulation en alternance, entre 9 h 30 et 15 h 30.


Top of the page.