Québec 511 > Road Conditions > Worksite in Detail
 
55
Hindranceminor (weekday) Start:
End:
Update:
September 16, 2025 at 8 a.m.
September 16, 2025 at 4 p.m.
September 9, 2025 at 10:33 a.m.

Direction(s): South and north
Location: À Saint-Boniface, au pont d'étagement situé sur le chemin Bellevue.
Work Type: Inspection de structure
Hindrance: Fermeture d'une voie sur deux, entre 8 h et 16 h.


Top of the page.