393
Hindrancemajor (weekday) Start:
End:
Update:
August 27, 2025 at 9 a.m.
August 28, 2025 at 3 p.m.
August 26, 2025 at 3:06 p.m.

Direction(s): South and north
Location: À La Sarre, sur le route 393 Sud, hauteur de la route 111
Work Type: Travaux de resurfaçage
Hindrance: Circulation en alternance, mercredi et jeudi, entre 9 h et 15 h
Hindrances Related to Load and Size: Voie réduite à 5 mètres


Top of the page.