Québec 511 > Road Conditions > Worksite in Detail
 
     
Hindranceminor (weekday) Start:
End:
Update:
August 18, 2025 at 7 a.m.
August 22, 2025 at 6 p.m.
August 14, 2025 at 6:17 a.m.

Direction(s): West and east
Location: À Notre-Dame-des-Monts, rang de Chicago Est, sur le pont de la rivière de Chicago
Work Type: Réfection d'un pont
Hindrance: Fermeture ponctuelle du pont, du lundi au vendredi entre 7 h et 18 h


Top of the page.