Québec 511 > Road Conditions > Worksite in Detail
 
132
Hindranceminor (weekday) Start:
End:
Update:
September 16, 2025 at 6:30 a.m.
September 16, 2025 at 8 p.m.
September 11, 2025 at 6:41 a.m.

Direction(s): West and east
Location: À Saint-André-de-Kamouraska, sur le pont de la rivière Fouquette
Work Type: Inspection de structure
Hindrance: Circulation en alternance, mardi entre 6 h 30 et 20 h
Details: Durée des travaux: 1 h
Hindrances Related to Load and Size: Largeur de la voie réduite à 5 mètres


Top of the page.