Québec 511 > Road Conditions > Worksite in Detail
 
131
Hindranceminor (weekday) Start:
End:
Update:
July 16, 2025 at 7 a.m.
July 16, 2025 at 6 p.m.
July 14, 2025 at 4:22 p.m.

Direction(s): South and north
Location: À Sainte-Émilie-de-l'Énergie, route Saint-Joseph, entre chemin des Épinettes et Ligne Saint-Joseph
Work Type: Inspection structure, rivière Noire
Hindrance: Circulation en alternance, mercredi entre 7 h et 18 h


Top of the page.