Québec 511 > Road Conditions > Worksite in Detail
 
     
Hindranceminor (weekday) Start:
End:
Update:
July 18, 2025 at 8 a.m.
July 18, 2025 at 10 a.m.
July 4, 2025 at 12:21 p.m.

Direction(s): South and north
Location: À Shawinigan, sur la rue Bellevue, au pont Bellevue situé au-dessus de la rivière Shawinigan.
Work Type: Entretien de structure
Hindrance: Circulation en alternance, entre 8 h et 10 h.


Top of the page.