|
10
|
Hindrance: major (weekday) |
Start:
End:
Update: |
October 5, 2025 at 10 p.m.
November 6, 2025 at 12 p.m.
October 17, 2025 at 2:56 p.m.
|
|
Direction(s): |
West and east |
|
Location: |
À Eastman
Entre le km 106,5 et le chemin Bellevue |
|
Work Type: |
Réfection de pont
|
|
Hindrance: |
Fermeture de 1 voie sur 2 et circulation déviée, en tout temps
De dimanche 22 h à vendredi 12 h |
|
Hindrances Related to Load and Size: |
Largeur de la voie à 4 mètres |
|
|