Québec 511 > Road Conditions > Worksite in Detail
 
117
Hindrancemajor (weekday and weekend) Start:
End:
Update:
July 3, 2025 at 9 a.m.
July 18, 2025 at 9 p.m.
July 2, 2025 at 11:04 a.m.

Direction(s): South and north
Location: À Mirabel, boulevard du Curé-Labelle, entre Côte Saint-Pierre et rue Brault
Work Type: Éclairage
Hindrance: Fermeture de 1 voie sur 2 en tout temps


Top of the page.