|
111
|
Hindrance: major (weekday) |
Start:
End:
Update: |
July 1, 2025 at 6 a.m.
August 6, 2025 at 8 p.m.
July 8, 2025 at 4:04 p.m.
|
|
Direction(s): |
South and north |
|
Location: |
À Val-d'Or (secteur Vassan), sur la route 111, entre les chemins Duval et des Loisirs |
|
Work Type: |
Travaux de resurfaçage
|
|
Hindrance: |
Circulation en alternance, du lundi au vendredi, entre 6 h et 20 h |
|
Hindrances Related to Load and Size: |
Voie réduite à 4 mètres. |
|
|