|
40
|
Hindrance: minor (weekday) |
Start:
End:
Update: |
July 10, 2025 at 8:30 a.m.
July 10, 2025 at 4:30 p.m.
June 27, 2025 at 11:30 a.m.
|
|
Direction(s): |
West and east |
|
Location: |
À Trois-Rivières, aux deux ponts situés au-dessus du chemin de fer CFQG. |
|
Work Type: |
Inspection de structures
|
|
Hindrance: |
Travaux d'accotements, entre 8 h 30 et 16 h 30. |
|
|